CSCEC's Dammam South Project—Eastern Region First Main Structure in Saudi Arabia topped out

Pubtime:26.01.2026
【Font size:BigMidSmallPrint

Recently, CSCEC's Dammam South Project—Eastern Region First Main Structure in Saudi Arabia in Saudi Arabia was successfully topped out, 30 days ahead of the scheduled milestone. As the first building to reach structural completion under the project, it lays a solid foundation for subsequent construction.

中国建筑沙特达曼南地块项目一期首栋楼顺利封顶1.png

The project includes 39 residential buildings (G+6F), totaling 168,000 m² and comprising 532 two-bedroom and 560 three-bedroom units. Scope covers design, surveying, testing, structural and architectural works, MEP installations, and landscaping. 

Since commencement, the project team adopts measures such as zoned flow-line operations, centralized material procurement, and early-stage technical briefings, significantly improving construction efficiency.

The team will maintain rigorous standards and lean management to deliver all remaining milestones on time. 

Site Map  |  Legal Statement  |  FAQ  |  Contact Us

©2017-2020 CSCEC ICP 05049820 CSCEC . LTD ICP 08010180