CSCEC completes first steel lift for Belgrade's new landmark

Pubtime:03.12.2025
【Font size:BigMidSmallPrint

中国建筑塞尔维亚首都新地标钢结构首吊1.png

The steel structure installation for the new Sava Bridge built by CSCEC, has successfully begun, marking the start of the steel structure construction. 

中国建筑塞尔维亚首都新地标钢结构首吊2.png

Rendering of the new Sava Bridge

The bridge is a key infrastructure project in Belgrade, Serbia's capital. Spanning 420 meters long and 38.1 meters wide, it is a dual-layer steel arch bridge with transverse trusses, pedestrian walkways, main arches, and box girder segments. Once completed, it will significantly reduce traffic congestion and improve urban mobility in Belgrade.

中国建筑塞尔维亚首都新地标钢结构首吊3.png

To ensure successful steel structure construction, CSCEC used intelligent bridge production equipment. Smart technology reduced the production cycle for each steel box girder by 15 days, increased labor efficiency by 20%, and improved cutting precision by 45%, ensuring quality and significantly shortening delivery times.

Site Map  |  Legal Statement  |  FAQ  |  Contact Us

©2017-2020 CSCEC ICP 05049820 CSCEC . LTD ICP 08010180