Steel structure of Haitian Production Plant Phase II Project in Serbia topped out

Pubtime:25.11.2024
【Font size:BigMidSmallPrint

Recently, the steel structure of  the Haitian Production Plant Phase II Project in Serbia, undertaken by CSCEC, was successfully topped out. Upon completion, the facility will serve as Haitian Group's key manufacturing base in Europe.

IMG_3887.JPG

Located in Ruma, Serbia, this project is the first equipment manufacturing base in the city. It includes 18 supporting structures, such as workshops and an administrative building. Once operational, the project will significantly enhance upstream and downstream industrial collaboration, create hundreds of local jobs, and contribute to the stable economic development of the region.

Site Map  |  Legal Statement  |  FAQ  |  Contact Us

©2017-2020 CSCEC ICP 05049820 CSCEC . LTD ICP 08010180