CSCEC's multi-directional asymmetrical cable-stayed bridge successfully rotated

Pubtime:18.03.2025
【Font size:BigMidSmallPrint

Recently, the 48,000-ton single-tower cable-stayed bridge, an important part of Xi'an's Xingfu Road North Extension Project built by CSCEC, was successfully rotated 69.45 degrees counterclockwise to its targeted position in 120 minutes. This accomplishment set a new national record for the heaviest multi-directional asymmetrical cable-stayed bridge rotation by now.

中国建筑转体吨位重型多向不对称斜拉桥成功转体1.jpg

With a total length of 1.51 kilometers, theXingfu Road North Extension Project is of great significance to improving the integrated transport system in the eastern part of Xi'an City and promote the economic development along the line.


Site Map  |  Legal Statement  |  FAQ  |  Contact Us

©2017-2020 CSCEC ICP 05049820 CSCEC . LTD ICP 08010180